CEnwo-ED-HB |
United States Army Corps of Engineers
Omaha District
|
|
Missouri River Improvement
(Photos 1934 to 1939)
- This area is very intensive in graphics. Please select a
theme below to see the photos.
- Bankhead Construction
- Pile Driver Operations
- Lumber Mattress Construction
- Lumber Mattress
- Dike Junctions
- Dike Terminals
- 2 Row Single Pile Dike
- 2 Row Pile Clump Dike
- Longitudinal Dikes
- 3 Row Pile Clump Dike
- Structure Failure
- Brace Dike
- Screen Mattress
- Crib Dikes
- River Improvement Structures
- Braced Batter Dike Construction
- Results of River Improvement Structures
- Standard Revetment Construction Operations
- Standard Revetment
- Standard Revetment Operation Prior to Channel Shift
- Willow Mattress
- Pile Revetment
- Standard and Pile Revetment Junction
- Willow Bank Protection
- Abatis
- Pilot Channel: By Dredge and Dragline Methods
- Dredge Operations
- Rock Dike
- Bartlett Dam Construction
- Frazers Bend Dam
- Mud Cells
- Asphalt Plant
- Asphalt Plant Operations
- Pile Driver in Operation
- Failure in Asphalt Paving
- Towboats and Inspection Launches
- Dredges
- Quarry Operation
- Quarterboats
- Material Yard Operations
- Creek & Drainage Ditches
- Brownville and Langdon Bends
- St. Mary's Bend
- Manowa Bend
- Peterson Bend
- California Bend
Comments or Problems
This site is new and may/will change as the system matures.
Last update June 26, 1997
For information on this html or this section, please send e-mail
to Water.Management@usace.army.mil